IceventService is ready to consider participation in projects as an engineering subcontractor. We will provide the full package of information necessary for prompt review of our company and inclusion in the list of approved contractors, as well as for participation in tender procedures.
Work packages
Key cooperation format: ready-made engineering packages tailored to your facility and contract model.
General Contracting / Turnkey Construction of Facilities
Integrated / Comprehensive Construction
Coordination of Subcontractors / Related Trades
Turnkey Project Delivery
Production capacities
Team composition
95 employees
25 engineering and technical personnel
70 fitters
2 design engineers
Organizational resources
3–4 projects simultaneously
Production and Technical Department (estimates, work execution plans, as-built documentation, handover support)
In-house construction and installation divisions
Procurement and logistics
Own warehouses and vehicle fleet
Permits
SRO construction
SRO design
Fire license from the Ministry of Emergency Situations
NAKS
NRS
Industrial safety, occupational safety
Electrical safety, VIK
Experience
Contracts 100+ million RUB
Cases for initial review and competency assessment.
Commercial construction · Altai Republic
External water supply networks. Water pipeline in the village of Barantal
Read more
Client:
JSC Proksima Company, private investor
Description of work
Project for the installation of external water supply networks. A water pipeline with a total length of over 50 km was constructed in 5 months. A total of 573 water supply wells and 28 chambers were installed. The work was carried out on 1,500 land plots. More than 80 people and 20 units of specialized equipment were involved in the project.
Implementation period: 18 months.
Commercial construction · Altai Republic
High and medium pressure gas distribution networks in the village of Barantal
Read more
Client:
JSC Proksima Company, private investor
Description of work
Project for the installation of high and medium pressure gas distribution networks in a newly forming settlement. The project includes the installation of cabinet-type gas distribution points.
The length of the high-pressure gas pipeline is 3,359 m, and the medium-pressure gas pipeline is 38,200 m.
Commercial construction · Altai Republic
Major construction in accordance with the design documentation “Groundwater intake with water supply networks for drinking, domestic, and technical water supply”
Read more
Client:
JSC Proksima Company, private investor
Description of work
Project for the construction of a second-lift pumping station. Mechanical, ultraviolet, and ozonation water treatment systems are provided. Water is supplied to the upper and lower sites by separate booster stations.
To accommodate personnel and maintain acceptable microclimate parameters, water supply, sewage, heating, and ventilation systems are provided.
Water is drawn from 13 wells and transported via polyethylene pipelines.
Water reserves for firefighting and utility needs are stored in two clean water tanks, each with a volume of 1,000 m³.
For external firefighting, wells with cast iron hydrants are provided.
The pipeline length for the upper site is 27.8 km, and for the lower site – 23 km.