Construction of engineering infrastructure in Siberia since 2009

Internal engineering systems, external networks, pumping stations, boiler houses, ITPs (individual heating points), and turnkey engineering infrastructure construction.
Vendor list and commercial proposals for EPC contractors, general contractors, and capital construction departments.

Key competencies

Internal Engineering Systems

  • Heating
  • Ventilation
  • Water supply and sewerage
  • Individual heating point inside buildings
  • Electrical installation work
  • Fire extinguishing systems

External Engineering Networks

  • Heat supply
  • Water supply
  • Sewerage
  • Gas supply

Pumping Stations / Boiler Houses / Individual Heating Points (ITPs)

  • Pumping stations
  • Boiler houses
  • Heating points
  • Process heating units
  • Solar collectors

General Contracting / Turnkey Construction of Facilities

  • Integrated / Comprehensive Construction
  • Coordination of Subcontractors / Related Trades
  • Turnkey Project Delivery

About the company

History

Since 2009, IceventService has been implementing engineering and capital construction projects in Siberia for industrial, commercial, and infrastructure facilities. The company performs a full cycle of works — from design development to installation, commissioning, and maintenance — providing reliable solutions and predictable results.

Why we are trusted

Engineering approach.

Comprehensive understanding of systems, solution optimization, execution of the full cycle of construction works.

Production.

In-house construction and installation divisions, mobilization, certified tools and equipment.

Operational management.

Experienced managers, strong production and technical department, schedule adherence, coordination of subcontractors.

Support.

Maintenance service, warranty service, operational support.

Key figures

  • Experience with contracts over 100+ million RUB
  • Subcontractor management
  • 95 employees
  • 70 fitters
  • 25 engineering and technical personnel
  • 2 design engineers
  • 3–4 projects simultaneously
  • Geography: all of Siberia

Permits and licenses

  • SRO construction
  • SRO design
  • Fire license from the Ministry of Emergency Situations
  • NAKS
  • NRS
  • Industrial safety
  • Electrical safety
  • Occupational safety
  • VIK

Industries in which IceventService has experience

Agribusiness

Engineering solutions for agricultural enterprises, storage and processing facilities

Commercial construction

Engineering systems for facilities with high requirements for comfort and operation

Industrial enterprises

Systems for efficient air exchange, safety, and sustainable production operation

Industrial Parks and Plants

Solutions for mechanical engineering, metalworking, and industrial infrastructure

Show other industries

Medical facilities

Solutions compliant with sanitary regulations, safety, and stable microclimate

Mining, Metallurgy

Systems for demanding industrial conditions and high loads

Power Industry

Engineering solutions for facilities with high loads and reliability requirements

Completed projects

Mining, Metallurgy

On-site utility networks of the Northern industrial site of the Uvalnaya Mine, JSC “UK Sibirskaya”, Novokuznetsk: installation of heat supply networks

Read more
Client:
JSC "UK Sibirskaya"
Description of work
During the execution of work, our specialists refined and introduced additional engineering and technical changes to the design and estimate documentation in order to optimize and improve the construction of this facility. The work was carried out on the Northern industrial site according to the Customer's working documentation. All work was completed on time with good quality, with the signing of a technical readiness certificate and the transfer of a complete set of as-built documentation. The total length of the heating main from the Boiler House building to the Heater Building is 603.4 m, consisting of pre-insulated pipelines 325/500 with underground channels and three above-ground compensators. Implementation period: July–November 2025.
Industrial enterprises · Kemerovo Oblast

Ventilation and air conditioning of a filter production workshop

Read more
Client:
LLC "Dis Group"
Description of work
The development of a ventilation and air conditioning design for the office area and filter production workshop has been completed. Supply and exhaust ventilation units with a total capacity of 32,000 m³/h were installed, featuring energy-efficient heat recuperators that reduce operating costs for air heating in winter and air cooling in summer. Duct-type industrial split systems with a total cooling capacity of 210 kW were installed. Premises area: 1,200 m². Implementation period: January – April 2025.
Commercial construction · Altai Republic

High and medium pressure gas distribution networks in the village of Barantal

Read more
Client:
JSC Proksima Company, private investor
Description of work
Project for the installation of high and medium pressure gas distribution networks in a newly forming settlement. The project includes the installation of cabinet-type gas distribution points. The length of the high-pressure gas pipeline is 3,359 m, and the medium-pressure gas pipeline is 38,200 m.
Commercial construction · Altai Republic

Major construction in accordance with the design documentation “Groundwater intake with water supply networks for drinking, domestic, and technical water supply”

Read more
Client:
JSC Proksima Company, private investor
Description of work
Project for the construction of a second-lift pumping station. Mechanical, ultraviolet, and ozonation water treatment systems are provided. Water is supplied to the upper and lower sites by separate booster stations. To accommodate personnel and maintain acceptable microclimate parameters, water supply, sewage, heating, and ventilation systems are provided. Water is drawn from 13 wells and transported via polyethylene pipelines. Water reserves for firefighting and utility needs are stored in two clean water tanks, each with a volume of 1,000 m³. For external firefighting, wells with cast iron hydrants are provided. The pipeline length for the upper site is 27.8 km, and for the lower site – 23 km.

Letters of appreciation

Partners and equipment suppliers the company works with on projects

Collaboration request

For the general contractor

Leave your contacts — we will send a package of documents for accreditation and inclusion in the contractor registry.

Attach a file (TOR / project / scope of work)
Request a commercial proposal

Leave your details — we will prepare a commercial proposal for the engineering work package.

Attach a file (TOR / project / scope of work)